Magento 2.4.8 needs PHP 8.3 or 8.4, MySQL 8.4 or MariaDB 11.4, and OpenSearch as the search engine. Adobe supports it until 31 May 2028. That is the short answer. The long answer is about what breaks during the upgrade: a module that did not follow PHP 8.4, a search still wired to Elasticsearch, a RabbitMQ queue to convert, two-factor authentication to set up again.
This article puts Adobe’s official figures in one place, checked on Adobe’s own pages and linked below. Then it gives the checklist our team runs on every Magento upgrade. We used it in October 2026 to move Vivaplante from Magento 1 to Magento 2.4.8 with Hyvä.
Magento 2.4.8: what changes, in one table
The versions below come from the Adobe Commerce system requirements (on-premises installation) and the 2.4.8 release notes.
| Component | Magento 2.4.7 | Magento 2.4.8 |
|---|---|---|
| PHP | 8.2 or 8.3 | 8.3 or 8.4 (8.2 only during the upgrade, 8.1 removed) |
| Database | MySQL 8.0, MariaDB 10.6 or 10.11 | MySQL 8.4 or MariaDB 11.4 (11.8 accepted from patch 2.4.8-p5) |
| Search | Elasticsearch 7.17 or 8, OpenSearch 2 | OpenSearch 2.19, then OpenSearch 3 from 2.4.8-p2; Elasticsearch modules are deprecated |
| Message queues | RabbitMQ 3.12 to 4.1 | RabbitMQ 4.1: quorum queues required |
| Cache | Redis 7.2 | Valkey 8 supported |
| Composer | 2.9.3 or later | 2.9.3 or later |
| End of standard support | 31 May 2027 (extended to 31 May 2028 for Adobe Commerce) | 31 May 2028 |
PHP needs one more line, because articles on the subject contradict each other. Adobe is clear: 2.4.8 adds PHP 8.4, keeps PHP 8.3, accepts PHP 8.2 only to run the upgrade, and removes PHP 8.1. So a store on 2.4.8 should not run on PHP 8.2 in production.
Support dates to keep in mind
Adobe gives each version three years of standard support from its release. The dates below come from the Adobe Commerce lifecycle policy:
- 2.4.6: standard support ended on 11 August 2026, extended support until 31 August 2027, then security fixes only until 31 May 2028;
- 2.4.7: standard support until 31 May 2027, extended support until 31 May 2028;
- 2.4.8: released on 8 April 2025, standard support until 31 May 2028;
- 2.4.9: released on 12 May 2026, standard support until 31 May 2029.
Two details matter. Extended support is for Adobe Commerce customers only: on Magento Open Source, treat the end of standard support as your deadline. And Adobe does not fix PHP itself. Its page notes that PHP 8.1 reached end of life on 31 December 2025 and PHP 8.2 reaches it on 31 December 2026, with a risk for PCI compliance. A store on 2.4.6 or 2.4.7 running PHP 8.2 has one more reason to move to 2.4.8.
2.4.8 or straight to 2.4.9?
Adobe released 2.4.9 in May 2026. It needs PHP 8.5, MariaDB 12.3 or MySQL 8.4, and OpenSearch 3. Aiming for 2.4.9 gives one more year of support, but every extension must then support PHP 8.5. Our rule is simple: we list the store’s extensions and check which ones are announced as compatible. If a key extension is not ready yet, 2.4.8 is the sensible target, and 2.4.9 comes with a later upgrade.
The checklist we run
A Magento upgrade is not a command you launch on a Friday evening. Here is what our team checks, in order.
- Module inventory. Every module: installed with Composer, copied into app/code, or custom built. For each one: a 2.4.8 compatible version exists, it needs changes, it must be replaced, or it goes. Modules nobody uses are removed at this stage.
- PHP code. Static analysis of the custom code to find what PHP 8.4 rejects or deprecates. Adobe states that PHP 8.4 support required backward-incompatible changes in the core, so modules that override those classes break first.
- Removed dependencies. TinyMCE 5 is gone in favour of TinyMCE 6, and several Laminas packages (mail, mime, file, oauth) are replaced. An editor or email module that relies on them must be reviewed.
- Search engine. Switch to OpenSearch, full reindex, then check results and filters with real customer searches. Search or layered navigation modules that call Elasticsearch directly are tested one by one.
- Server. PHP version, database, RabbitMQ (migrate to quorum queues before RabbitMQ 4), Varnish, cache. We build the new stack next to the old one, never in its place.
- Admin. Duo two-factor authentication moves to Web SDK v4 and needs a Client ID and a secret in the configuration. Encryption keys can only be changed from the command line. New indexers default to “Update by Schedule”, so cron jobs must run correctly.
- Theme. On Luma, review overridden templates and JavaScript: 2.4.8 updates RequireJS, several jQuery libraries and Moment.js. On Hyvä, update the theme and its compatibility modules at the same time.
- Staging with real data. A copy of the production database, then tests of the journeys that bring revenue: login, search, cart, checkout, payment, emails, data flows to the ERP or PIM.
- Go-live. A date outside busy periods, a freeze on other releases, a backup, a written rollback plan, then closer monitoring for the following days.
A real case: Vivaplante, from Magento 1 to Magento 2.4.8
Vivaplante is a group of ten perennial growers near Lyon, France. It sells to garden centres through a B2B site we built on Magento 1 in 2014. In October 2026, we moved it to Magento 2.4.8 and Hyvä. The constraint: nothing should change for its 2,600 trade customers.
We ran the migration in two passes with the official Magento migration tool. The first pass moved the catalogue (about 11,500 products), customers, customer groups and order history, for testing. The second, on the morning of the launch, brought over the latest orders. Customers logged in with the same usernames and passwords. The site went live on a new server managed by our team, and the home page scored 90 on mobile and 98 on desktop in a Lighthouse test in November 2026.
The full story is in the Vivaplante case study.
Should you move to Hyvä at the same time?
An upgrade already forces you to review the theme. If the Luma theme has many overrides, replacing it with Hyvä can cost less than bringing it up to date. Several of our migrations combined both: Carré Blanc, whose site is connected to more than 110 stores, MaxOutil and its 45,000 products, where we also set up our first Hyvä Checkout, and Meilland Richardier, with its ERP connection. On the other hand, if the theme is recent and lightly changed, keep the two projects apart and keep the upgrade short.
Our Hyvä agency page explains what a move to Hyvä changes.
When to plan the upgrade
Never in the weeks before sales, Black Friday, 11.11 or Christmas. Allow time for the inventory, the module work and the tests, then set the go-live in a quiet period, with a release freeze around it. Our team works across European and Asian time zones, which makes it easier to staff a switch at night for your customers. For a store on 2.4.6 or 2.4.7, the real deadline is the end of support of its version, and for PHP 8.2, the end of life on 31 December 2026.
Check your store first
Before we quote an upgrade, we start with a free check of the store: Magento version, missing security patches, speed, with results within 24 hours. You can request it on our Magento maintenance and support page, which also explains what a maintenance plan covers after the upgrade.